Project Information

Installation of Intelligent Transportation Systems on US 290 from Mueschke Rd. to Badtke Rd. in Harris Co. Texas Department of Transportation 1/12/2015 1:58:07 PM

Project Narrative

This project will provide necessary expanded coverage of existing incident management, congestion management, and traveler information systems infrastructure for the TxDOT Houston District (TranStar) region. This improvement project will allow TranStar to move closer to achieving the goal of DISTRICT-WIDE integrated coverage. A fiber connection needs to be made to SH 99 Grand Parkway to enhance reliability, redundancy and continuity of operations for US 290, SH 99 (Grand Parkway) and other major corridors in the region. This project will improve real-time incident detection, responsiveness and notification; and also improve real-time traffic monitoring and reporting capabilities of recurring congestion. A fiber connection would be made to SH 99 Grand Parkway which will enhance reliability, redundancy and continuity of operations for US 290, SH 99 (Grand Parkway) and other major corridors in the region. The project will involve instrumentation of a freeway, US 290 Northwest Freeway, from Mueschke Road to Badtke Road in Harris County. Specifically, this project will include the installation of 8.2 miles of conduit bank and 144-strand fiber trunkline; including 15 closed-circuit cameras, 4 dynamic message signs, 5 radar-based vehicle sensing devices, and 5 travel time readers. Additionally, this ITS segment improvement will better serve an existing regional evacuation route and provides for fiber-optic communication redundancy. None. However, since this is an ITS infrastructure expansion versus conventional roadway capacity expansion, the inherent benefit is to gain more capacity utilization of the existing facility without any environmental impacts or requiring additional right-of-way/heavy construction.

Project Narrative

Yes

TIP Project Scope 300753.xlsx

Categorical Exclusion (CE) (c)(21) Deployment of electronics, photonics, communications, or information processing No 02/07/2018 No Yes No Utility Adjustments will be needed. No

No Public Involvement activities are needed.

The conduit will be installed by a road construction project. The project design can be at 30% complete within 30 days after notice to proceed.

TIP Project Scope 300753.xlsx

Map/Location

TIPS Project 300753.pdf

Project Budget

Project Budget TIP Application 300753.xlsx

Yes

OM Budget for TIP Application 300753.xlsx

No

Screening Questions

Yes ITS technology deployment is typically at least 7-10 years before retrofit or total replacement is required.

Evalutation Questions - ITS Projects

Benefit /Cost Methodology

H-GAC to conduct analysis based on the GIS/map project location and project scope information provided above.

Congestion Safety

Incident/Event Management

Coordination

System Migration/Expandability

Asset Mgmt/Efficient Operations

Continuity Operations

System Lifecycle/Maintenance Issues