Who is Completing the Application?

Please provide contact information for the person who will complete the online application for this project. The email address and password entered here will be used to complete and submit both Pre-Applications and Applications.

Maureen Crocker

Assistant Director

832-395-3222

[email protected]

Primary Agency Information

Please provide contact information for the agency official who is representing the project sponsor. This individual will be considered the official applicant and must be authorized by their agency to submit this request for funding and make necessary assertations and representations on the agency’s behalf.

City of Houston -Houston Public Works

Maureen Crocker

Assistant Director

832-395-3222

[email protected]

611 Walker

Houston

TX

77002

Additional Agency Information

Project Information

Gelhorn Drive

Harris County

Gelhorn Drive

IH610 to IH10

The City of Houston is participating in a FEMA Technical Assistance Initiative to promote Supply Chain Resilience related to the Grocery Sector. Supply Chain Logistics is extremely complex, and its integrity can be impacted during weather related and other significant events. The purpose of the technical assistance program is to equip participating jurisdictions with the skills and tools to maintain grocery distribution within communities that become “land locked” from uncontrollable events. Studies show that most jurisdictions have ample stockpiles to meet the demand accrued from extreme events, but aging or overburdened infrastructure hinders access to distribution routes. Emergency Preparedness Models are being challenged to include Grocery Resilience as a core necessity similar to Water, Power, Shelter and Transportation. Cities are encouraged to identify distribution centers and evaluate their capability to meet the demand and identify any hindering effects to transportation routes. Gelhorn is a 0.7 mile 4-lane roadway that serves an industrial/commercial distribution area between IH610 and IH10. The pavement has severe cracking and potholes. There is a narrow 4ft sidewalks that is not continuous along the proposed limits and no ADA compliant crosswalks. The area serves a major grocery chain distribution center, Food Bank, and other commercial distributors. 28% of the traffic is from heavy trucks that serve the adjacent businesses. The road is also in poor condition and has had several maintenance repairs. Flooding occurs frequently during heavy storms causing disruption to business delivery and daily operations. Channel improvements have been identified by HCFCD to improve conveyance.

The proposed project would reconstruct the roadway with the existing 4-lanes, median turn lanes, and on-street buffered bicycle facility. The project would also include 6ft sidewalks, and ADA compliant ramps and crosswalks creating better pedestrian connectivity and improved accessibility to existing transit. The project will upgrade underground utilities. Improvement to the H-103-00-00 tributary by Harris County Flood Control District has been listed on the HCFCD bond package. Construction of the drainage and roadway improvements will improve the resilience of this grocery center distribution network and nearby industrial businesses.

Improved grocery distribution resilience. Improved freight connector between IH-610. and IH-10 Improved Intersection Operation through turn lanes at medians. Improved pedestrian safety, pedestrian mobility, and transit access with continuous 6ft sidewalks. Bicycle mobility will also be improved with added 5ft buffered bicycle facility and connections to adjacent bike corridors per the Houston Bike Plan. Improve pavement surface, and more durable pavement standard for heavy truck traffic and extended service life.

No

No

Less than $100 million

(Maintain) Infrastructure Resiliency

5713782

HPW PreAp letter.pdf

Project Development/Readiness

Not Started

Categorical Exclusion (CE)

01/21/2022

No

No

Yes

No

No

No

No

City of Houston conducted a pre-engineering study on the roadway. See attached report. Support Letters: Kroger's, Houston Food Bank Channel Improvements have been identified on Harris County Flood Control District bond election for Channel H-103-00-00, see page 7 of bond list

Gellhorn_report_HEBletter.zip

Map/Location

Gelhorn_map1.pdf

Project Budget

project-budget-Gelhorn.xlsx

No

Benefit/Cost Analysis

Roadway-Safety-Benefits-Gelhorn.xlsx

10312018110038AM.xlsx

Roadway-Emissions-Gelhorn.xlsx

TIP Resolution 2018-0035.pdf

Planning Factors - Environmental Justice

Yes

Yes

Planning Factors - Frequency of Hazard Impacting Roadway Usage

Yes

The roadway is in much need of repair due heavy truck traffic. Additional, heavy rainfalls in the area frequently flood the roadway causing impediments to logistics from the adjacent distribution centers. The combination of this roadway improvement project and Harris County Flood Control District bond project will improve grocery resilience and overall resilience of the region during storm events. Gelhorn is not listed on a designated freight system, but does connect to both IH-10 and IH-610 which are on the National Highway Freight Plan.

Planning Factors - Hazard Identified in the County Hazard Mitigation Plan

Yes

BCA_doc_supportletter.zip

Planning Factors - Planning Coordination

Yes

City of Houston Major Thoroughfare and Freeway Plan

https://www.houstontx.gov/planning/transportation/MTFP.html

Planning Factors - Preventative Activities

Yes

HCFCD_bondmap.JPG

Planning Factors - Roadway Hierarchy/Freight System Priority/Evacuation Route

Collector

No

No

No

Yes